Environmental impact assessment and acceptance report of Shandong Longfei additivesShandong Longfei additives Co., Ltd The annual output of 30000 tons of liquid grinding aids, 200000 tons of powder grinding aids and 20000 tons of concrete admixtures of Shandong Longfei additives Co., Ltd. (phase I project) Completion environmental protection acceptance monitoring (investigation) report Construction unit: Shandong Longfei additives Co., Ltd Prepared by: Shandong Longfei additives Co., Ltd May, 2002 Construction unit: Shandong Longfei additives Co., Ltd Legal representative: Li Long Prepared by: Shandong Longfei additives Co., Ltd Legal representative: Li Long Project Leader: Li Long Prepared by: Li Long Construction unit preparation unit Tel: 18706352888 Tel: 18706352888 Postal Code: 252200 postal code: 252200 Address: 200m North West of the intersection of zhuojiang road and Beihuan Road, Donga County Economic Development Zone, Shandong address: 200m North West of the intersection of zhuojiang road and Beihuan Road, Donga County Economic Development Zone, Shandong catalogue 1 acceptance project overview 1 2 acceptance basis 1 2.1 laws, regulations, rules and specifications related to environmental protection of construction projects 1 2.2 technical specifications and standards for environmental protection acceptance of construction project completion 2 2.3 environmental impact report form of construction project and approval decision of approval department 3 2.4 approval documents for total amount of major pollutants 3 2.5 other approval documents of environmental protection department 3 3 project construction 3 3.1 geographical location and plane layout 3 3.2 construction contents 8 3.3 main raw and auxiliary materials and fuels 12 3.4 water source and water balance 12 3.5 production process 15 3.6 project changes 17 4 environmental protection facilities 17 4.1 pollutant treatment / disposal facilities 17 4.2 other environmental protection facilities 21 4.3 investment in environmental protection facilities and implementation of "three Simultaneities" 22 5 main conclusions and suggestions of construction project EIA report 24 5.1 main conclusions and suggestions of construction project EIA report 24 5.2 approval decision of approval department 28 6 acceptance standards 29 7 commissioning effect of environmental protection facilities 30 7.1 wastewater 30 Exhaust gas 30.2 7.3 noise monitoring at plant boundary 32 8 quality assurance and quality control 32 8.1 monitoring and analysis methods 32 8.2 personnel competence 34 8.3 quality assurance and quality control in the process of water quality monitoring and analysis 34 8.4 quality assurance and quality control in gas monitoring and analysis 34 8.5 quality assurance and quality control in noise monitoring and analysis 34 9 acceptance monitoring results 35 9.1 production conditions 35 9.2 monitoring results of pollutant discharge up to standard 35 9.3 total pollutant accounting 42 10 implementation of EIA reply 44 11 acceptance monitoring conclusion 49 12 "three Simultaneities" completion acceptance registration form for environmental protection of construction project 51 enclosure: Annex 1: EIA reply Annex 2: working condition certificate Annex 3: Test Report Annex 4: 1. Overview of acceptance items Project Name: annual output of 30000 tons of liquid grinding aids, 200000 tons of powder grinding aids and 20000 tons of concrete admixtures of Shandong Longfei additives Co., Ltd. (phase I project) Construction unit: Shandong Longfei additives Co., Ltd Legal representative: Li long project contact: Li Long Construction nature: new construction Industry category: c2661 chemical reagent and auxiliary manufacturing Construction site: 200m north of the intersection of zhuojiang road and Beihuan Road, Donga County Economic Development Zone, Shandong Province Preparation unit and completion time of EIA report: Shandong bohuan Environmental Engineering Consulting Co., Ltd. completed the preparation in January 2020. Environmental impact assessment approval department: on April 2, 2020, it was approved by donga branch of Liaocheng ecological environment bureau with "Dongxing shenhuan report form [2020] No. 7". Implementation of pollutant discharge permit of the project: according to "special chemical product manufacturing 266" in the catalogue of classified management of pollutant discharge permit of fixed pollution sources (2019 Edition), the project has been included in the pollutant discharge permit management and belongs to key management. The enterprise is applying for a pollutant discharge permit. 2 acceptance basis 2.1 laws, regulations, rules and specifications related to environmental protection of construction projects (1) Environmental protection law of the people's Republic of China (Order No. 22 of the president, revised on April 24, 2014 and implemented from January 1, 2015); (2) Law of the people's Republic of China on Environmental Impact Assessment (Order No. 77 of the president, revised on December 29, 2018 and implemented on December 29, 2018); (3) Law of the people's Republic of China on the prevention and control of air pollution (Order No. 31 of the president, revised and adopted on October 26, 2018 and implemented from October 26, 2018); (4) Law of the people's Republic of China on the prevention and control of water pollution (Order No. 87 of the president, amended on June 27, 2017 and implemented from January 1, 2018); (5) Law of the people's Republic of China on the prevention and control of environmental noise pollution (Order No. 77 of the president, amended on December 27, 2018 and implemented from December 27, 2018); (6) Law of the people's Republic of China on the prevention and control of environmental pollution by solid waste (Order No. 31 of the president, revised for the fourth time on November 7, 2016); (7) Decision of the State Council on Amending the regulations on the administration of environmental protection of construction projects (Order No. 682 of the State Council, adopted on June 21, 2017 and implemented on October 1, 2017); (8) Notice on Further Strengthening the management of environmental impact assessment and preventing environmental risks (HF [2012] No. 77, effective from July 3, 2012); (9) Notice on strengthening risk prevention and strict management of environmental impact assessment (HF [2012] No. 98, effective from August 7, 2012); (10) Measures for environmental information disclosure of enterprises and institutions (ministerial Order No. 31, adopted on December 15, 2014 and implemented from January 1, 2015); (11) Scheme for information disclosure mechanism of environmental impact assessment of construction projects (HF [2015] No. 162, implemented from December 11, 2015); (12) Interim Measures for acceptance of environmental protection after completion of construction projects (ghghghp [2017] No. 4, effective from November 22, 2017); (13) Technical guidelines for environmental protection acceptance of construction projects (pollution impact) (Announcement No. 9 of the Ministry of ecology and environment in 2018, effective from May 16, 2018); (14) Notice on standardizing the construction unit to independently carry out the acceptance of environmental protection after the completion of construction projects (hbehh [2017] No. 1235); (15) Notice on printing and distributing the list of major changes in construction projects in Central China under EIA Management (HB [2005] No. 52); (16) Notice on printing and distributing key points of on-site inspection and review of environmental protection acceptance of completed construction projects (HB [2015] No. 113); (17) Interim Provisions on the administration of pollutant discharge permits; (18) Catalogue of classified management of pollutant discharge permits from fixed pollution sources (2019 Edition); (19) National hazardous waste management directory (August 1, 2016); (20) Environmental impact report of Shandong Longfei additives Co., Ltd. Shandong Longfei additives Co., Ltd. with an annual output of 30000 tons of liquid grinding aids, 200000 tons of powder grinding aids and 20000 tons of concrete admixtures (2020.1) issued by Shandong bohuan Environmental Engineering Consulting Co., Ltd; (21) approval opinions of dong'a branch of Liaocheng Ecological Environment Bureau < Dongxing shenhuan report form [2020] No. 7 > "reply to the environmental impact report form of the project with an annual output of 30000 tons of liquid grinding aids, 200000 tons of powder grinding aids and 20000 tons of concrete admixtures of Shandong Longfei additives Co., Ltd. (April 2, 2020); (22) production load certificate during acceptance monitoring; (23) Liaoshi Testing Technology Co., Ltd; (24) other enterprise technical materials. 2.2 technical specifications and standards for environmental protection acceptance of construction project completion (1) Class II emission standard in Table 2 of integrated emission standard of air pollutants (GB16297-1996); (2) Emission concentration limits of "general control area" in Table 1 of the comprehensive emission standard of regional air pollutants (DB37 / 2376-2019); (3) Table 2 of emission standard of air pollutants for building materials industry in Shandong Province (DB37 / 2373-2018); (4) The emission limits of environmental noise at the boundary of class 3 acoustic environment functional areas in the emission standard of environmental noise at the boundary of industrial enterprises (gb12348-2008); (5) Standard for pollutant control of general industrial solid waste storage and disposal sites (gb18599-2001) and its amendment requirements; (6) Technical specification for fixed source waste gas monitoring (HJ / t397-2007); (7) Technical guidelines for unorganized emission monitoring of air pollutants (HJ / t55-2000). 2.3 environmental impact report form of construction project and approval decision of approval department Donghang shenhuan report form [2020] No. 7, see Annex 1. 2.4 approval documents for total amount of major pollutants None. 2.5 other approval documents of environmental protection department, etc None. 3. Project construction 3.1 geographical location and plane layout Shandong Longfei additives Co., Ltd. is located in the west of 200 meters north of the intersection of zhuojiang road and North Ring Road in Donga County Economic Development Zone, Shandong Province. The central coordinates of the project plant area are 116.286 longitude and 36.376 latitude. The south side of the project is Sifeng chemical fertilizer company, and other directions are open spaces. The distribution of environmental sensitive points around the project is shown in table 3-1, the geographical location of the project is shown in Figure 3-1, the plant plan is shown in Figure 3-2, and the distribution of environmental sensitive points around the project is shown in Figure 3-3. Table 3-1 distribution of sensitive points Protection category protection target orientation factory boundary distance protection level Atmospheric environment Jiezhuang village n 850m ambient air quality standard (gb3095-2012) class II Zhanglou village e 1000M Hu Lou ese 1360m EN 1250m, Chuzhuang Village Surface water environment zhaoniuhe w 3900m class IV standard of environmental quality standard for surface water (GB3838-2002) Surrounding groundwater site selection - class III in the quality standard for groundwater (GB / t14848-2017) 200m around the noise - class 3 standard in environmental quality standard for noise (gb3096-2008) Figure 3-2 project layout plan 3.2 construction content Shandong Longfei additives Co., Ltd., established on September 14, 2013, is a company specializing in the R & D, production and sales of cement grinding aids, retarders and concrete admixtures. The project is located in the west of the 200m North Road at the intersection of zhuojiang road and Beihuan road in Donga County Economic Development Zone, Shandong Province. The workshop and office of Donga County Hongsheng Power Equipment Co., Ltd. are rented for production, including 2 production workshops, with a construction area of 10190.4m2 and 1 office, with a construction area of 1000m2. A total of 29 sets of mixing tanks, powder comprehensive production lines and other equipment are purchased for phase I project. The investment of phase I project is 20 million yuan, and the production scale is 20000 tons of liquid grinding aid and 150000 tons of powder grinding aid. The labor quota of phase I project is 40 people, and the working system is a single shift system, with 8 hours per shift and an annual working time of 300 days and 2400 hours. The project consists of main works, auxiliary works, public works, environmental protection works and storage works. The main construction contents of the project are shown in table 3-2, the main production equipment of the project are shown in table 3-3, and the main products of the project are shown in table 3-4. Table 3-2 list of project composition Category construction project construction content remarks actual construction subject The steel structure of the engineering 1# production workshop is on the first floor, covering an area of 8062 square meters. It is a powder grinding aid production workshop. Located in the east of the plant and north of the office building, it is mainly equipped with unloader, mixer, belt conveyor, conveyor, high-speed disperser, counter roll crusher and other workshops. Relying on the original, the new production line is consistent with the EIA 2# the steel structure of the production workshop is on the first floor, covering an area of 2128.4 square meters. It is the production workshop of liquid grinding aid and concrete admixture. Relying on the original workshop, the new production line only produces liquid grinding aids auxiliary The project office is made of brick and concrete, with a construction area of 1000 square meters. The existing lease is consistent with the EIA public The water supply of the project relies on the tap water of donga Hongsheng Power Equipment Co., Ltd. Based on the original, it is consistent with the EIA The drainage relies on the rainwater and sewage diversion drainage system of donga Hongsheng Power Equipment Co., Ltd., and the rainwater is collected and discharged into the municipal rainwater pipe network. The production and domestic sewage of the project enters Donge County Guohuan sewage treatment Co., Ltd. for treatment through the sewage pipe network. Relying on the original and consistent with the EIA The annual power consumption of power supply is about 536200 kwh, which is provided by Donga County power supply company and relies on a s13-250 transformer of Donga County Hongsheng Power Equipment Co., Ltd. Relying on the original and consistent with the EIA 7 raw material tanks (3 liquid grinding aids and 4 concrete admixtures) and 8 finished product tanks (4 liquid grinding aids and 4 concrete admixtures) are set in the tank farm (in the workshop) of the storage and transportation project Raw material bin, finished product bin and powder grinding aid workshop are set with 5 raw material bins, 10 (150t) finished product bins and 1 lime bin Transportation mode: all raw and auxiliary materials and products of the project are transported by automobile - consistent with the EIA environment protection Waste gas treatment 1# workshop of the project: the discharged dust is mixed with lime and gypsum, and the mixing dust is discharged through the bag filter + 15m exhaust funnel (P2) in the discharge area; The crushing and dispersing dust and the dust in the mixing area are treated by the bag filter in the finished product area, and the discharged dust are discharged through a 15m exhaust funnel (P2); The top of lime silo, stone powder silo, fly ash silo and slag micro powder silo are respectively
Article classification:
Company News
|